Skip to content
Book online

Call or text (909) 284-4597

Builders and owner-builders

Construction debris dumpsters

Elevated Hauling & Disposal offers dumpster rental for construction and demolition debris across the San Bernardino Mountains, from Crestline and Lake Arrowhead to Big Bear. Framing scrap, drywall and tear-out are bulky; heavy debris like concrete or tile needs a call first.

We work alongside contractors, owner-builders and homeowners. Below: what the County's mountain transfer stations refuse, the asbestos rule for older cabins, and sorting for California's 65% recycling target.

Dump trailer piled with demolition lumber beside a cabin stairway, with the pickup truck and a ridge of tall conifers behind

Key facts

Dumpster rental
$250 flat per rental, 24 hours included
Extra days
$15 each extra day
Disposal
Billed by weight after dumping, 6–9¢ per lb depending on material
Size

Ask Robert about the size: call or text (909) 284-4597.

Delivery and pickup
Robert brings the dumpster on a trailer behind his pickup and sets it on your driveway or property. When your rental is up, he picks it up and hauls the load away to be dumped and weighed.
How to book
Online, or call or text (909) 284-4597. No payment online. Robert confirms your dates and how to pay by call or text.
Junk removal and hauling
Quoted per job: call, text or send a request.

What counts as construction debris

Construction and demolition (C&D) debris is what's left after you build, remodel or tear something out. On a mountain job it usually looks like this. Tell us what's in the pile when you book, and call first about anything heavy.

  • Framing lumber, plywood and OSB offcuts
  • Drywall and paneling
  • Old cabinets, doors, windows and trim
  • Flooring, carpet and pad
  • Siding, decking and fencing (pressure-treated wood needs separate handling, see below)
  • Roofing shingles and underlayment (heavy, so ask first)
  • Concrete, brick, tile and rock (the heaviest of all, so call before loading)
  • Pallets, packaging and cardboard from material deliveries

Planning the dumpster for a construction job

Most construction debris is bulky before it is heavy: framing scrap, drywall offcuts, packaging and tear-out. Break it down and load it flat so the load packs tight and travels safely.

Concrete, tile, rock and dirt are the opposite: heavy before they are bulky. Disposal is billed by weight after the load is dumped, so a load of concrete or tile costs more to dump than the same pile of lumber offcuts. Ask before you load anything heavy.

Not sure how to plan it? Text Robert a photo of the pile or the job site, and he will talk it through with you.

What the County's mountain transfer stations turn away

San Bernardino County runs two transfer stations on the mountain that take construction and demolition debris: Heaps Peak, on Highway 18 west of Running Springs, and the Big Bear Transfer Station on Holcomb Valley Road. The County lists both as open Monday through Saturday. Check its disposal-sites page for current hours and fees before you haul a load yourself, and cover it: the County charges double for uncovered or unsecured loads.

Both stations refuse certain materials. Keep these out of the dumpster until you have talked to us:

  • Pressure-treated wood (only the County's Mid-Valley landfill in Rialto and its Victorville landfill accept it)
  • Items longer than 4 feet, the County's length limit at transfer stations
  • Refrigerators or freezers that still hold refrigerant
  • More than nine tires in a load (tires must be off the rim)
  • Paint, solvents, liquids, sealed containers and other hazardous waste
  • Batteries, fluorescent tubes and mercury thermostats
  • Hot ashes or anything still smoldering
  • Asbestos, and debris from pre-1984 or burned buildings that hasn't been certified

Older cabins and the asbestos rule

Much of the mountain's housing predates 1984. The U.S. Census Bureau's median year built is 1966 in Crestline, 1971 in Running Springs, 1976 in Big Bear Lake, 1977 in Lake Arrowhead and 1978 in Big Bear City. In each place, at least half the homes were built before 1984.

That matters for demolition. San Bernardino County requires an asbestos certification before it accepts demolition debris from any structure built before 1984, and from any burned structure, whatever its age. A Certified Asbestos Consultant tests the material first, then County Solid Waste authorizes disposal.

Get the testing done before tear-out starts. Debris that hasn't been cleared should not go in the dumpster.

Building-permit jobs: sorting for the 65% rule

California's 2025 green building code (CALGreen), in force since January 1, 2026, requires building-permit projects to recycle or salvage at least 65% of their nonhazardous construction and demolition waste. In unincorporated San Bernardino County you file a Construction Waste Management Plan online in EZOP before the building permit is issued, upload weight tickets, hauler diversion reports and reuse letters during the job, and file Part 2 before final inspection.

Where the debris goes decides the credit. The County gives mixed construction loads taken to Heaps Peak or the Big Bear station 27% diversion credit. Loads taken to a source-separated recycling facility earn 100%. A mixed load alone won't get a building-permit job to 65%.

Sorting is what gets you there. Keep clean wood, metal, concrete and cardboard apart from the mixed trash, keep every weight ticket and receipt, and tell us about your plan when you book so we can talk through what paperwork we can give you. Inside Big Bear Lake city limits, ask the City's Building & Safety office how it handles construction waste plans.

Pressure-treated lumber

Old deck boards, fence posts, landscape timbers and treated framing are treated wood waste under California law. It can't be burned, chipped for mulch or scavenged, it can't be stored on the ground, and once it has been separated it can't be mixed back in with other waste. Only approved lined landfills can take it. In San Bernardino County that means Mid-Valley in Rialto or Victorville, not the mountain transfer stations.

A July 2026 bulletin from the Contractors State License Board points contractors to TWWDisposal.org for current handling rules. If a job includes treated wood, tell us before it goes in the dumpster so we can plan how it's handled.

Placing the dumpster on a job site

By default, Robert sets the dumpster on your driveway or lot, not the street. A dumpster in a County road right-of-way needs an encroachment permit from County Public Works, a state highway needs one from Caltrans, and a Big Bear Lake city street needs one from the City's engineering office.

The County's mountain guidelines also keep building materials out of road shoulders, drainage ditches and walkways so snowplows can work. In winter, pick a spot behind the snow berm line and keep the path to it clear. When you book, mark the spot and tell us about slopes, tight turns, low limbs or wires overhead.

Good to know

Mountain transfer stations
Heaps Peak (Hwy 18) and Big Bear (Holcomb Valley Rd)source for Mountain transfer stations
Recycling target on building-permit jobs
65% of C&D waste (CALGreen)source for Recycling target on building-permit jobs
Credit for mixed loads at those stations
27% diversionsource for Credit for mixed loads at those stations
Asbestos certification required for
Debris from pre-1984 or burned buildingssource for Asbestos certification required for
Treated wood accepted at
Mid-Valley and Victorville landfills onlysource for Treated wood accepted at

Not sure it fits your job? Text Robert a photo.

Send it with your town and what is going in. Robert will help you plan the load, or tell you if a haul-away makes more sense.

Text Robert a photo

Rather we do the loading?

Junk removal means we load it and haul it away in one visit. Need equipment or materials moved instead? See equipment and material hauling. Both are quoted per job.

About junk removal

The dumpster

Renting our dumpster for construction debris

The booking calendar shows each day as open or booked. See pricing or what can go in.

Black Elevated Disposal dumpster set in the driveway of a mountain home under tall pines, with the empty trailer and truck parked on the road

Dumpster rental

Robert brings the dumpster on a trailer behind his pickup and sets it on your driveway or property. When your rental is up, he picks it up and hauls the load away to be dumped and weighed.
  • Set on your driveway or property, close to the work
  • Load it at your own pace, then Robert picks it up on your pickup day
  • Weight drives the disposal charge, so mention heavy debris like shingles, tile or concrete
  • Paint, oil, batteries and other hazardous waste stay out

$250 flat, 24 hours included

$15 each extra day. Disposal billed by weight after dumping.

Ask Robert about the size: call or text (909) 284-4597.

Questions

Construction debris: common questions

What size is the dumpster?

Ask Robert about the size: call or text (909) 284-4597.

Not sure it fits your job? Text Robert a photo. Include your town and what is going in.

Do you work with contractors and owner-builders?

Yes. We rent our dumpster to contractors, owner-builders and homeowners across the mountain. If you have several jobs coming up, ask about repeat bookings when you call so we can plan the dates around your crew.

Can you give me weight tickets or receipts for my County waste plan?

Ask when you book. San Bernardino County's Construction Waste Management Plan asks for weight tickets, hauler diversion reports and reuse letters during the job, so tell us up front that you have a plan and we will tell you what paperwork we can provide for your file.

Mixed loads taken to the County's mountain transfer stations earn 27% diversion credit, so sorting on site matters as much as the paperwork.

How much construction debris has to be recycled?

On projects that need a building permit, CALGreen requires at least 65% of nonhazardous construction and demolition waste to be recycled or salvaged. The 2025 edition has been in force since January 1, 2026.

In unincorporated San Bernardino County you show it through a Construction Waste Management Plan filed in EZOP. Mixed loads at Heaps Peak or the Big Bear station count 27%. Source-separated loads taken to a recycling facility count 100%.

Can concrete, dirt or roofing go in the dumpster?

Call first. Heavy debris adds up fast by weight, and disposal is billed by the pound after the load is dumped, so concrete, wet dirt and shingles cost more to dispose of. Robert will talk through the load with you before you start.

I'm tearing out part of an older cabin. What should I know first?

Check for asbestos before demolition. San Bernardino County requires an asbestos certification before it accepts demolition debris from any structure built before 1984, or from any burned structure. A Certified Asbestos Consultant does the testing.

Much of the mountain's housing predates 1984. The Census Bureau's median year built is 1966 in Crestline and 1977 in Lake Arrowhead.

Can old deck boards or pressure-treated lumber go in with everything else?

Tell us first. Treated wood waste has its own rules in California: no burning, no chipping for mulch, and no storing it on the ground. The County's mountain transfer stations don't accept it. Only its Mid-Valley and Victorville landfills do. We will plan the load with you before it goes in.

Can the dumpster sit in the street in front of the job?

Plan on the driveway or lot. A dumpster in a County road, a state highway or a Big Bear Lake city street needs an encroachment permit from whoever owns the road, and the County's mountain guidelines keep building materials out of shoulders and ditches so plows can work.

Got a project on the mountain?
Let’s get it hauled.

Request your dumpster online in a couple of minutes, or call or text and talk it through. We confirm price and delivery with you before anything rolls.